Mamostaian Street has been selected as a case study.
Length of the street 3.75 Km and Width of one lane 3.6 m
2-way divided 6-lane ,have 5 intersections
Objectives of the Project:
Determine the type of deficiency in the road network
Prepare a scientific solutions
Prepare a booklet for municipality engineers
This project is the one projects of the city lab sulaimani performance by Directorates of Sulaimani Municipality and Tourism , University of Sulaimani , Directorate of Traffic Police
This project at the start about 15 volunteers have worked and till now about 670 hours has worked